South Iredell High School AquaLab Construction – Part 2

After our last post, Ron Morgan engaged students at SIHS who are eagerly waiting for the AquaLab to be complete. Topics covered ranged from food to culture to international outreach.

IMG_20140417_124601_671

Ron Morgan speaking to students at SIHS

Construction of the two raft hydroponic systems and the fish tank stands have started. The pond liners have been cut and inserted into their wooden frames. The frames have a horizontal support beam to prevent bowing when filled with water.

IMG_20140506_145642_980

Wooden frames for the raft hydroponic units being constructed.

IMG_20140723_140908_306

Liners laid inside frames

IMG_20140724_144653_830

Raft hydroponic units filled with water and being tested for leaks

The fish tank stands will be raised to allow for gravity draining into the greenhouse hydroponic units. This will raise the tanks for maximum viewing.

IMG_20140506_124518_684

600 gallon fiberglass tank with viewing window

IMG_20140506_124529_916

Two circular tanks which will mimic the engineering one would see in a commercial fish farm

 

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s